MiWay Bus Facility – 975 Central Parkway
Location: Mississauga, Ontario
Project Type: Structured Cabling & Network Infrastructure
Project Overview
24Smart Solutions completed a major structured cabling and network infrastructure project across two buildings at the MiWay bus facility at 975 Central Parkway in Mississauga.
The project included the installation of more than 10,000 feet of horizontal network cabling, along with network outlet relocations, meeting-room raceway installation, and server room infrastructure upgrades.
Services Provided
- New horizontal network cabling installation — 10,000+ feet
- Data outlet relocation
- Network infrastructure installation
- Raceway installation for meeting rooms
- Installation of two new patch panels
- Server room network infrastructure upgrades
- Cable organization and termination
Project Scope
The primary scope of the project was the installation of a new network cabling infrastructure across two buildings. More than 10,000 feet of horizontal cabling was installed to provide reliable network connectivity throughout the facility.
As part of the project, existing data connections were also relocated where required. Raceway systems were installed in meeting rooms to provide clean and organized pathways for network cabling.
The server room was upgraded with two additional patch panels, expanding the network infrastructure and providing a more organized termination point for the newly installed cabling.
Project Highlights
- 2 buildings
- 10,000+ feet of horizontal network cabling
- New network infrastructure
- Data outlet relocations
- Meeting-room raceway installation
- 2 new patch panels
- Server room infrastructure expansion